We have scheduled sealing and striping of all asphalt areas on campus to tentatively occur weather permitting Tuesday April 16 (upper lots and driveways in yellow) and the lower lot and driveways (blue) Wednesday April 17.
Wednesday April 17: Lower Lot/Blue Shaded Areas
- Prep, sealing and striping will take place in lower lot (blue) and corresponding driveways will be blocked off with cones/barricades. Anticipated to re-open for parking 6pm.
- Anticipated normal use/parking after 6pm lower lot (blue).